Jiangbei New District Planning Exhibition Hall (Civil Center of New District) Notice of Tender for Construction General Contracting Project

Lot number: AJB170005-04SG

Nanjing Pukou New City Development & Construction Co., Ltd.; Construction Project Jiangbei New District Planning Exhibition Hall (New District Civic Center) has been approved by the project approval department (Approval No.: Ningxin District Guan Jingfa [2017] No. 1). The source of funding needed for the project [state-owned non-governmental funds: 129,686,800 yuan;] has been implemented. In this project, the bidder’s qualification examination shall adopt the online prequalification method to select qualified bid applicants to participate in the bid.
I. (Tendering Agency) is entrusted by the tenderee to take charge of the bidding of this project. This project uses online bidding.
Second, the tender project profile:
1. The name of the bid: The general contracting project
2. Project location: Dingshan Street, Pukou District
3, project type: large-scale project
4. Construction content: house construction project; installation project;
5, structure type: steel structure
6, duration requirements: 600 calendar days
7. Estimated price of the project contract: 550 million yuan
8. Bidding content: civil construction and hydropower installation; steel structure and grid structure engineering; fire protection engineering;
9. Description of unit project and scope of bid: Type of Project: This project is a multi-functional city hall integrating urban display, administrative services, civic activities and supporting facilities; the main construction contents include New District Planning Exhibition Hall, New District Civic Center, and Government Affairs. Service halls and supporting service facilities, warehouses, underground garages, equipment rooms, outdoor road plazas and greening. Large public building projects such as convention centers are technically complex projects.
Project Scale: The project is located in Dingshan Street, Pukou District, north of the junction of Dingshan Avenue and Binjiang Avenue. The project covers an area of ​​approximately 2.0578 hectares and the total construction area (including overhead layers) is approximately 7,5256.3 square meters, of which: above-ground construction area (including ground The overhead building area is about 48,546 square meters, the basement building area is about 26,710.3 square meters, and the single span of the building is 43.8 meters.
10. Project size: Building area: 75256.3 m2; Building number: 6 floors; Ground floor number: 6 floors; Basement number: 1 floor; Building height: 35.82 m; Basement area: 267010.3 m2; Construction cost 550 thousand yuan; single largest building area: 75256.3 m2; number of buildings: 1; steel span: 63 m; weight: 14320 tons; steel span: 63 m; total weight: 14320 t; : 63 m.
Third, the bid applicant qualification conditions:
1. Qualification level and scope of the bidder: The first-level (inclusive) or above of the general contractor construction project.
2. Qualification category and grade of project manager: Registered construction certificate above grade 1 (inclusive).
3. Whether this tender accepts the Commonwealth bid: No
4. Whether this tender accepts the yellow card warning unit bid: No
Fourth, prequalification documents obtained:
1. From the date of publication of this announcement until the deadline for submitting prequalification application documents, bid applicants should download the prequalification documents by visiting the Nanjing Public Resource Trading Center website (ggzy.njzwfw.gov.cn/njggzy).
V. Qualification Examination Methods:
1. The qualification examination method for bidders shall be implemented in accordance with the provisions of Su Jianzi (2013) No. 4 document and related regulations and documents.
2. The project is in accordance with Su Jian Zi Zi (2013) No. 4 document. The necessary qualifications for passing the qualification are:
(1) Has the ability to independently conclude contracts;
(2) It is not in the state that it has been ordered to suspend business, its qualifications have been cancelled, or its property has been taken over, frozen or bankrupted;
(3) The company did not suffer from problems such as fraudulent bid winning or serious breach of contract, major project quality, safety production accidents, etc., and was suspended by the relevant department to be qualified for bidding and was suspended within the period;
(4) The qualification category and grade of the enterprise and the qualification grade of the project manager satisfy the tender announcement requirements;
(5) When applying for prequalification in the form of a consortium, the qualification (qualification) conditions of the consortium must comply with the requirements and be accompanied by a joint bidding agreement;
(6) The company has safe production conditions and obtains a safety production license (except when the relevant regulations do not require it);
(7) The project leader must meet one of the following conditions:
a. The project leader is not under construction after the change;
b. The person in charge of the project has no construction in progress after the change, and: the original contract period is full and the date of change of the record has reached 6 months; or, the project was suspended for more than 120 days due to non-contractor reasons, and the project was constructed. The unit agrees and has gone through the change procedures of the person in charge of the project;
c. The person in charge of the project has a construction in progress. However, the construction in progress and the project in this bidding belong to the same project, the approval of the same project, and the subcontracting or phased construction of the same construction site.
(8) Meet other conditions stipulated by laws and regulations. Other conditions are:
no
3. The project is in accordance with Su Jianzi (2013) No. 4 document. The optional qualification conditions for qualified inspection are:
(1) The company has undertaken similar or above projects.
The above-mentioned enterprises' similar or above-mentioned projects refer to: Since November 1, 2012 (inclusive), the company has undertaken a general contracting project for public buildings with a single contract construction area of ​​45,000 square meters and above. (Public buildings do not include residential buildings (such as residential buildings, commercial and residential buildings, single apartments, etc.), industrial buildings (such as industrial plants, warehouses, etc.) [need to provide notification of the successful bid, construction contract, completion acceptance certificate, three missing one No. The time is based on the completion acceptance report time, and the area is based on the contract or final acceptance certificate.When the area of ​​the provided certification materials is inconsistent, the area in the final acceptance certificate shall prevail. The provided certification materials must be able to reflect The use of the building is related to the data and content of the public building and the above requirements, and the similar performance certification materials are based on the information entered in the “e Road Sunshine” corporate credit bank.]
4, determine the potential bidder method: limited quantity system
If there are more than 9 applicants under the limited number of qualifications and passed the qualification examination, nine prequalified applicants will be selected for the bid in order of highest score.
5. Qualification of the bidder shall be reviewed by the reviewing committee of the project in accordance with the review criteria stipulated in the prequalification documents. In order to facilitate the review, the bidder must enter the following materials on the “e Road Sunshine” credit platform before submitting the prequalification application documents: Enterprise Business License, Enterprise Qualification Certificate, Safety Production License, Registered Construction Engineer Certificate, and Project Manager Safe Production Assessment of materials such as certificate of conformity (if any), performance information (notice of successful bid, contract, certificate of completion acceptance). For details, see the prequalification documents.
Six, bid evaluation methods:
This section uses a comprehensive assessment method.
1, do not use two-phase review
2, using the dark label
3, construction organization design review method
Grading system: The bid evaluation committee will score the construction organization design of the bid documents according to the assessment points identified in the bid documents.
4. Calculation and revision of benchmark bids: Mode 3
Appraisal benchmark price calculation method
Method 5: At the time of bid opening, the bidder shall randomly select the bidder's representative to determine one of the following methods as the evaluation criteria for the bid price.
Method one: The arithmetic mean of the bid price of valid bid documents shall be A (if 7 ≤ valid bid documents <10, remove one of the highest price and one lowest price and take the arithmetic mean value as A; if valid bid documents For ≥10 homes, remove the two highest prices and the two lowest prices and take the arithmetic average as A). Evaluated benchmark price = A × K, K value is selected randomly by the bidder's representative before the bid opening, K value range is from 95% to 98% (values ​​are 95%, 95.5%, 96%, 96.5) %, 97%, 97.5%, 98%). The evaluation price is equal to the full score of the benchmark price.
Method 2: The arithmetic mean of the bid price of valid bid documents is A (if 7 ≤ valid bid documents <10, remove one of the highest price and one lowest price and take the arithmetic mean value as A; if valid bid documents For ≥10 homes, remove the two highest prices and the two lowest prices and take the arithmetic average as A), and the highest bid limit price as B, then: the evaluation benchmark price = A × K1 × Q1 + B × K2 × Q2, Q2 = 1 - Q1; Q1, K1 values ​​are determined at random by the representative selected by the bidder. The extraction range of Q1 is 65%-85% (extracted values ​​are 65%, 70%, 75%, 80%, and 85%), and the extraction range of K1 is 95%-98% (extracted values ​​are 95%, 95.5%, 96%, 96.5%, 97%, 97.5%, 98%); K2 is specified by the bidder in the bidding documents.
Base price revision method: After adopting this method, after the bid evaluation is completed, except for the confirmation of calculation errors, the bid evaluation benchmark prices for method one and method two are not changed due to the bidding party's query, complaint, reconsideration and any other circumstances.
5, the calculation formula of the deviation rate of the bid price
Deviation Rate = 100% × | Bidder's Quotation - Bid Evaluation Benchmark Price |/ Bid Evaluation Benchmark Price
6, quote evaluation deviation
Total score: 100 points. Tender offer: 84 points. For every 1% increase in the benchmark price deviating from the benchmark price, there is a deduction of 0.9 points. For each 1% deduction of 0.6 points, if the deviation is less than 1%, the score is calculated according to the insert method.
7, construction organization design
1. General overview: the overall concept of construction organization, program specificity and division of construction bids;
2. The layout of the construction site and temporary facilities, temporary road layout;
3. Construction schedules and guarantees for progress at each stage;
4. Construction plans and quality assurance measures for each sub-project;
5. Safe and civilized construction and environmental protection measures;
6. Staffing, quality and management experience of the project management team;
7. Workforce, mechanical equipment and material input plans;
8. The key construction difficulties, difficulties and solutions for the implementation of key construction technologies, processes and projects;
9. Construction measures under special conditions such as winter rainy season construction, existing facilities, pipeline reinforcement and protection;
10. New technologies, new products, new processes, new materials applications;
Construction organization design: 10 points.
8, other scoring factors
Credit score: 6 points using credit rating score of Nanjing Municipal Construction and Construction Committee
Seventh, other:
1. The name of the unit of the bidder must be the same as that of the company's business license, enterprise qualification certificate and safety production license. Failure to do so will result in unqualified prequalification.
2. The bidder must provide the certificate of payment of the old-age insurance issued by the labor and social security department to the person in charge of the project reported for the last half year (May 2017 to October 2017) (definite payment month, personal name, Payment unit). It must be stamped with the official seal of the social security agency or the electronic security seal for the social security center's payment and payment proof (if the bidder is a unit of the nature of the undertaking, it can provide the relevant certification of the social insurance fund department of the institution or institution). The bidder can scan and upload it to In the bidding documents, otherwise it will not be processed as a prequalification.
3. The person in charge of the bid is not under construction.
4. The personnel will not be required to attend the audit, but the project manager reported by the bidder must bring the original of his valid ID card to the project leader before the deadline for submission of the prequalification application documents (Nanjing Public Resource Exchange Center 1247). Room), who fails to arrive at the scene or arrive at the scene according to the regulations but fails to provide the above originals in full, will be deemed to have bidder's right to repudiate this bid automatically.
5. Deadline for submitting prequalification application documents: The method of submitting prequalification application documents at 09:30, Beijing time, December 25, 2017: The bidders should upload their own documents before the deadline for submission of prequalification application documents. e Road Sunshine "online bidding system.
6. Qualification review location: Room 1247, Nanjing Public Resource Exchange Center, 265 Jiangdong Middle Road, Nanjing.
7, bidders to participate in the opening bid meeting personnel requirements:
(1) Before the deadline for submission of bids, the agent of the legal representative of the bidder shall bring the original of his valid ID card to the site of the opening bid and submit the original ID card. The originals shall be checked on the spot when the tickets are singed, if no one arrives or cannot be provided. If the original or submitted original is invalid, it shall be regarded as the bidder's right to abstain from bidding on this bid.
(2) Before the deadline for submission of bids, the person in charge of the project submitted by the bidder shall bring the original of his valid ID card to the site of the opening bid meeting and submit the original ID card. The originals shall be checked on the spot when the tickets are singed, if no one arrives or the originals cannot be provided or If the original submitted is invalid, it shall be deemed that the bidder shall give up the bid right of this bid.
8. Business license of enterprise legal person, enterprise qualification certificate, enterprise safety production license, registered construction engineer certificate, registered construction division safety production evaluation certificate (B certificate), similar performance, award certificate (or The qualification documents, such as the winning documents, are all recorded using the e-line sunshine credit platform. If the bidder has incomplete information on the “e-line sunshine” credit platform, the data content must be completed before the deadline for bid submission. Not approved at the time of examination.
9. The person in charge of the project submitted by the bidder must be the same as the person in charge of the project that was submitted during the prequalification. Otherwise, the tenderee has the right to cancel the qualification of the bidder.
10. The "limited quantity system" specific scoring method is as follows:
I. Financial status of the company: (20 points)
1. Enterprise registered capital (10 points):
The registered capital of the enterprise is more than 1.5 billion yuan and 10 billion yuan; the registered capital is less than 1.5 billion yuan, and the registered capital is less than 1 billion yuan.
[Provide verification of business license, enterprise's registered capital is subject to business license, business license is subject to scan in "e Road Sunshine" corporate credit bank]
2. Owners' equity of the company (10 points):
The owner’s equity of the company is more than RMB 1 billion, which is 10 points; the value of the company’s owner’s equity is RMB 6 billion; the owner’s equity of the company is RMB 2 billion.
[Provide the bidder's 2016 audit report issued by the accounting firm. The audit report shall include the accounting firm unit seal and the certified public accountant's practice seal. The original copy shall be scanned and uploaded into the electronic qualification examination document.]
Second, similar project performance (40 points):
1. Performance of public building projects undertaken by the company (40 points):
(1) Since November 1, 2012 (inclusive), the company has undertaken a single-contract construction contracting project for a public building with a single contracted construction area of ​​45,000 square meters and above.
(2) Since November 1, 2012 (inclusive), the company has undertaken a single-contract construction project with a total contracted construction area of ​​53,000 square meters and above.
(3) Since November 1, 2012 (inclusive), the company has undertaken a single-contract construction contracting project with a construction area of ​​60,000 square meters and above.
This item provides up to 2 performances with a maximum score of 40 points.
[Needs to provide a notification of the successful bid, construction contract, and certificate of completion acceptance, all three are indispensable. The time is based on the completion acceptance report time, and the area is based on the contract or final acceptance certificate. When the area provided in the certification materials is inconsistent, the area in the final acceptance certificate shall prevail. The certification materials provided must reflect the use of the building as public buildings and the relevant data and content of the above requirements. Proof of similar performance is based on the information entered in the “e Road Sunshine” corporate credit bank. 】
In this score item, the score of the same performance is calculated according to the highest score, only once, and no double counting is done.
Third, the certification system (10 points):
The bidder obtains the following system certificate and has 10 points within the validity period. If any of the bidders do not receive any of the following scores:
(1) The company has passed the quality management system certification (within the validity period);
(2) The company has passed the environmental management system certification (within the validity period);
(3) The company has passed the occupational health and safety management system certification (within the validity period);
[Provide the certificate of enterprise management system during the valid period, and the certificate shall be based on the scanned documents in the self-built database of "E-road Sunshine". 】
Fourth, engineering awards (20 points):
1. The housing construction projects undertaken by the company have won the National Excellent (referring to the Luban Award, the “National Quality Project Award” issued by the China Association of Construction Enterprises Management, China Civil Engineering Society and Zhan Tianyou Civil Engineering Technology Development Foundation jointly reviewing “China Civil Engineering Zhan Tianyou Award ") 10 points / piece for the award, a maximum of 20 points;
[Awards for projects won by enterprises shall be provided with a certificate of award or verification of awards within the validity period; the validity period shall be calculated from the date of self-issuance of certificates or documents, until the deadline for submission of qualification documents. If the time for issuing and distributing documents is inconsistent, the time of issuing the documents shall prevail. The certification materials provided must reflect the relevant data and content, otherwise it is deemed not to be provided. The certification materials shall be based on the scanned documents in the “e-line Sunshine” corporate credit bank. 】
V. Responsibility of the project leader: (10 points)
The person in charge of the project responded in writing and had two questions. Each question was scored 5 points out of 10 points.
According to the content of the project leader's reply, the grade points are scored. Excellent score of 5, good score of 4, middle score of 3, difference of 2 points, and no score.
[Authorized by the Jury Committee, the project leader responds in writing on the site and has two questions, 5 points for each question. The defense shall adopt the dark mark review, and the content of the reply shall not appear in any characters and logo (including words, symbols, patterns, logos, logos, personnel names, company names, corporate standards or numbers unique to bidders, etc.) that can identify the bidder’s identity. The name of the relevant person should be replaced by job title or job title. 】
Cumulative score: 100 points.
Explanation:
The certification materials provided in the requirements of this announcement are described as follows:
1) Public buildings do not include residential buildings (such as residential buildings, commercial and residential buildings, single apartments, etc.), industrial buildings (such as industrial plants, warehouses, etc.).
2) The period of validity of the award means that: The period of validity for obtaining the project award shall be implemented in accordance with the following regulations: The validity period is calculated from the date on which the self-issuance certificate or document is issued and until the deadline for submission of the qualification examination documents. If the time for issuing and distributing documents is inconsistent, the time of issuing the documents shall prevail.
3) If the number of qualified pre-qualified bid applicants is more than 9, the tenderer will use the above table to comprehensively score all pre-qualified bid applicants and determine the top 9 bid applicants as potential bidders. If there is a situation with the same comprehensive score, the following sequence of data will be used to determine the priority of the following data: (1) The company's registered capital is high; (2) The company's similar project has a large construction area; (3) The project leader responds with a score. High.
4) The tenderee will investigate the authenticity of the personnel and performance and the implementation of the relevant project. If the bidder finds that the bidder is falsified, he will cancel the bid for this project and report to the construction administrative department.
The publication date of this announcement will be from 9:33 on December 13, 2017 to 9:33 on December 20, 2017.

OLED Display

Oled Display,The Oled Display,Oled Lcd Display,Oled Screen Display

Shenzhen Newvision Technology Co.Ltd , https://www.newvisionlcd.com