How to reduce the joint loss when the fiber is welded

How to reduce fiber splice joint loss

Definition: A certain amount of loss caused by the transmission of light to the joint after the fiber is connected is called the splice loss or the splice loss.

Reason: The splice loss of the fiber is mainly composed of the transmission loss of the fiber itself and the splice loss at the splice of the fiber. Since the quality of the fiber connection affects the transmission loss of the fiber line, and the transmission line distance of the fiber line is not relayed, it is necessary to reduce the loss of the fiber fusion joint as much as possible to ensure the transmission quality of the fiber CATV signal.

So how do you reduce the loss of the fiber splice joint? Methods as below:

1. Try to use the same batch of high-quality brand-name bare fiber on one line.

2. Optical cable erection is carried out as required

3. Select experienced and well-trained fiber optic splicers to connect

4. The connecting cable should be carried out in a neat environment.

5. Select high-precision fiber end face cutter to prepare fiber end face

6, the correct use of the fusion machine

Threading tips in wiring

In the wiring project, the level of construction directly affects the performance of the system, and serious rework, such as the wrong slotting, the color mark on the distribution frame, and the wrong numbering, etc. For example, if the cable passes through the steel pipe and passes through the transition box, etc., it is a commonly used technology. Now we will summarize the more mature experience in this aspect for your reference.

Threading technology is a relatively common technique in wiring. In order to ensure that the cable is not scratched and cause a "short circuit", plastic guards should be placed at all steel pipe ports. A feasible method is that the threading personnel should carry the "protective mouth" at any time during construction, and can be placed at any time when needed, so as not to be "lazy" because there is no "guard" at hand. When the vertical cable is turned into the vertical steel pipe through the transition box and goes to the next layer, the suspension should be tied in the transition box to prevent the cable weight from being fully pressed on the inner cable of the corner, because this will affect the transmission characteristics of the cable. The cables in the vertical trunking are to be tied once per meter. The cables placed in the trunking should be straight, entangled, and consistent in length.

Regarding the "remaining line" problem, the length of the "remaining line" of the cable at the wiring box should be the same, and not too long. It is best to group the remaining lines according to the grouping table, straighten and tie them from the outlet of the line slot, and the distance between the binding points is not more than 50cm. It should be noted that it is not possible to tie wires or hard power cables.

Regarding the labeling problem, the cables are numbered according to the computer plan, each label corresponds to a pair of four core wires, and the corresponding room and socket positions cannot be mistaken. In practice, this is the most error-prone place. The experience is that the label positions on both ends are 25cm away from the end, and the light-colored plastic tape is attached. The oily pen is used to write the label or the paper number is attached, and then the transparent tape is wrapped.

In addition, it is generally necessary to wear a spare line in a ratio of 3%, and the spare line is placed in the trunk line slot, and at least one spare line is required for each layer. After the threading is completed, all 4 pairs of core cables should be fully tested for continuity. The test can be carried out by peeling off the cores of the cables at both ends to expose the copper core. At one end, the digital multimeter is dialed to the on/off test file, the two test leads are connected to a pair of cable cores, and the pair of cable cores are frequently and briefly contacted at the other end. If the end of the watch can hear intermittent sound, it means the test passes, and 4 pairs of cores of each cable are tested. Through such tests, problems of disconnection, disconnection, and mislabeling can be found.

During the wiring, there is also a need to pay attention to the fact that when the cable is pulled out of the cable box and has not been placed in place, if the construction is to be suspended, the cable should be carefully wrapped and retracted for safekeeping. This is a place that many wiring construction teams without standard management often overlook.

The offered light is manufactured using high quality factor inputs and sophisticated technology. Provided with intelligent digital controllers, these are known for enhanced battery life and user friendly system. They manufacture this array with the use of modern machines and up to date skills. Too the Solar Street Light is available to our patrons at nominal rates.If these items are all properly assessed, then we are able to provide an efficient, reliable, economically sound, purpose-built solar street lighting network.

60W Integrated Solar Street Lights

60W Integrated Solar Street Lights,Integrated Solar Street Light 60W,Integrated 60W Solar Street Light,Integrated Solar 60W Led Street Light

Yangzhou Bright Solar Solutions Co., Ltd. , https://www.cnbrightsolar.com